Zhejiang 5.992MWp Photovoltaic Power Station

Zhejiang Zhongda Yuantong 5.992MWp roof distributed photovoltaic power generation project has been selected as one of the top ten distributed photovoltaic innovation cases in Hangzhou. The project was built in February 2017 and was connected to the grid on July 6, 2017. The annual power generation was about 5.47 million kwh, and the total power generation capacity was 126 million kwh for 25 years. It is worth mentioning that the project leverages an innovative solution integrating photovoltaic components and building materials to achieve the perfect integration of function and aesthetics, fully demonstrating UE's strength in technology innovation.

Type
-
Solar Power
Size
-
5.99 MWp
Location
-
Zhejiang, China
On-grid Date
-
2017-07-06